Solutions

Reduce cooling tower power costs by 20–35% — verified.

Every Melfrank solution starts with an on-site audit and ends with measured savings. We don't sell equipment, we sell outcomes.

Solution

Timber to FRP Pultruded Revamping

Replace ageing timber or RCC cooling tower structures with pultruded FRP — engineered for 25+ years of corrosion-free operation. Done in phases without halting plant operations.

25+ year design life

Phased shutdown plan

Zero corrosion

Improved thermal performance

Solution

Energy Efficient EC Fan Retrofit

Retrofit conventional axial fan + motor + gearbox assemblies with EC fans and smart controllers. Typical projects deliver 20–35% power savings on the cooling tower load, with payback inside 24 months.

20–35% power saving

18–24 month payback

Smart variable speed

No gearbox maintenance

Solution

Repair and Maintenance

Scheduled and breakdown maintenance for any brand of cooling tower. Fill replacement, drift eliminator changes, fan balancing, gearbox overhauls, basin cleaning and structural repairs — pan-India.

AMC contracts

Breakdown response

Brand-agnostic

Pan-India teams

Solution

Performance Audits

Independent thermal and energy audits with calibrated instruments. We benchmark your tower against design, identify performance gaps and quantify the savings potential before any capex.

Calibrated instruments

Thermal performance test

Energy benchmarking

Investment-grade report